冷再生機出租之水泥改良土施工流程

來源:http://www.mshjwlk.com/ 日期:2021-07-30 發布人:
一、適用范圍
1、 Scope of application
冷再生機出租為保證路床厚度范圍內的CBR值和壓實度達到規范要求,全線路床上部36cm厚采用6%水泥土處理。針對低填淺挖路基,當路基填方高度或挖方深度≤155cm時,路床下部44cm厚換填4%的水泥土處理,路床上部36cm厚換填6%水泥土處理。
In order to ensure that the CBR value and compactness within the thickness range of the roadbed meet the specification requirements, the 36cm thick upper part of the roadbed of the whole line is treated with 6% cement soil. For low fill and shallow excavation subgrade, when the subgrade filling height or excavation depth is ≤ 155cm, the 44cm thick lower part of the roadbed shall be replaced with 4% cement soil, and the 36cm thick upper part of the roadbed shall be replaced with 6% cement soil.
二、作業準備
2、 Job preparation
1、冷再生施工租賃場地準備
1. Preparation of rental site for cold regeneration construction
(1)直接填筑的路基基底,施工前必須通過審查簽證;需要進行地基處理的基底必須完成各項處理,并滿足地基處理的要求。
(1) The subgrade base directly filled must pass the examination and visa before construction; For the base requiring foundation treatment, various treatments must be completed and meet the requirements of foundation treatment.
(2)場地應該保證足夠的平整度,滿足設備、人員進場要求。
(2) The site shall ensure sufficient flatness to meet the mobilization requirements of equipment and personnel.
(3)做好場地的臨時排水和防雨措施。按照施工運量和施工機械的大荷載修筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. The construction access road shall be built according to the construction traffic volume and the large load of construction machinery.
2、技術準備
2. Technical preparation
做好相關人員的技術培訓和技術交底工作,使參加施工的全體人員充分認識高速鐵路路基填筑的關鍵技術、質量控制要點。
Do a good job in technical training and technical disclosure for relevant personnel, so that all personnel participating in the construction can fully understand the key technologies and quality control points of subgrade filling of high-speed railway.
3、勞動力、機械設備配置
3. Allocation of labor force and mechanical equipment
人員、機械設備應根據施工方案組合工期要求進行合理的配置。路堤填筑區為一個完整的作業區,每個作業區人員配置:施工隊長1名,領工員2名,指揮卸土位置人員2名,測量及試驗檢測人員4~6人,其他機械工、普工20~30人。
The combination of machinery and equipment shall be reasonable according to the requirements of construction period. The embankment filling area is a complete operation area, and the staffing of each operation area is: 1 construction team leader, 2 foremen, 2 personnel directing the unloading position, 4 ~ 6 measurement and test personnel, and 20 ~ 30 other mechanics and general workers.
根據施工需要,每個作業面配備反鏟挖掘機一臺、宣化-140推土機一臺、YZ-22振動壓路機兩臺、天工-160平地機一臺,徐工-230灰土拌和機,自卸運輸車6輛,撒水車一臺備用。當運距較遠時,自卸車的數量可適當增加
According to the construction needs, each working face is equipped with one backhoe excavator, one xuanhua-140 bulldozer, two yz-22 vibratory rollers, one tiangong-160 grader, xcmg-230 lime soil mixer, 6 dump trucks and one sprinkler for standby. When the transportation distance is long, the number of dump trucks can be increased appropriately

閱讀/ Recommended reading

  在道路施工領域,冷再生機租賃業務日益紅火,但其在低溫環境與凍土、巖層等特殊地質條件下作業時,常面臨諸多挑戰。深刻了解設備低溫啟動限制,掌握應對特殊地質的有效方法,是租賃方與施...

冷再生機租賃故障應對:全流程解決指南 2025-07-04
水泥撒布車料倉:讓存量監測成為 “一目了然的智慧管家” 2025-07-03
冷再生機租賃:路面 “回春妙手” 能解哪些難題? 2025-07-02
冷再生機租賃:道路養護的 “省錢省力魔法棒” 2025-07-01

產品/ Recommended products