天氣清冷之前冷再機怎么保養一下?
來源:http://www.mshjwlk.com/ 日期:2021-10-26 發布人:
1、將設備啟動移已選好場地,將轉子罩彈簧銷軸取出,再將轉子放置低點,切記不可懸置或有吃力現象,造成大臂油缸銷軸取不出來,油管泄壓易出危險。
1. Move the equipment startup to the selected site, take out the spring pin shaft of the rotor cover, and then place the rotor at the lowest point. Remember not to suspend or have difficulty, resulting in the failure to take out the pin shaft of the boom oil cylinder and the danger of oil pipe pressure relief.
2、拆卸油管和轉子馬達的保護罩殼。
2. Remove the protective cover of oil pipe and rotor motor.
3、將馬達到工作泵的6根油管在大臂連接處全部拆卸開,并用衛生紙和塑料帶將接口全部封緊,預防進入灰塵及雜物,并取下連接鋼管。
3. Remove all 6 oil pipes from the motor to the working pump at the boom connection, seal all the interfaces with toilet paper and plastic tape to prevent dust and sundries, and remove the connecting steel pipe.
4、卸掉馬達上的螺栓,并取下馬達,注意需要兩個人必須輕拿輕放。
4. Remove the bolts on the motor and remove the motor. Note that two people must handle it gently.


5、將轉子罩殼所有的連接桿拆卸,取下銷軸。
5. Remove all connecting rods of the rotor housing and remove the pin shaft.
6、將連接兩個大臂與固定橫桿上的螺栓拆卸掉,只留兩邊上面的4個。
6. Remove the bolts connecting the two boom and the fixed cross bar, leaving only 4 on both sides.
7、拆掉橫桿和車體連接的4個螺栓,上下面做好標記,方便安裝。
7. Remove the 4 bolts connecting the cross bar and the vehicle body, and mark the upper and lower parts for easy installation.
8、用吊車掛轉子一側的大臂處,另一側掛馬達后側的銷軸,先提升盡大量向一側移動,然后將兩根鋼絲繩均掛到出來的那一側,拖外面。
8. Hang the boom on one side of the rotor with a crane, and hang the pin shaft at the back of the motor on the other side. First lift and move to one side as much as possible, and then hang both steel wires to the side out and drag them to the outside.
9、卸掉滑靴,吊出轉子罩。
9. Remove the sliding shoes and lift out the rotor cover.
10、卸掉大臂與橫桿和轉子的連接處的螺栓,吊出大臂,放置一邊。
10. Remove the bolts at the connection between the boom and the cross bar and the rotor, lift out the boom and place it aside.
11、卸掉減速機固定螺絲,并用撬棍插入軸套壓住,用吊車吊出減速機,放置一邊,檢查有無滲漏現象。
11. Remove the fixing screws of the reducer, insert the crowbar into the shaft sleeve and press it, lift out the reducer with a crane, place it aside and check for leakage.
12、放開減速機的兩個油堵,放凈廢油。因兩個油堵成90度角,在加注新油時,減速機平放的基礎上必須讓注油孔在高點,直到觀察孔漏油為止,然后將油堵纏上生料帶上緊,如油堵是無‘O’型圈的類型,需在生料帶的外面涂抹密封膠,觀察12小時后有無滲漏現象。
12. Release the two oil plugs of the reducer and drain the waste oil. Since the two oil plugs form a 90 degree angle, when filling new oil, the reducer must be placed horizontally, and the oil filling hole must be at the highest point until the observation hole leaks oil, and then wrap the oil plug with the raw material belt to tighten it. If the oil plug is of the type without 'o' ring, it is necessary to apply sealing glue on the outside of the raw material belt and observe whether there is leakage after 12 hours.
13、將以上步驟反之,安裝完畢。在安裝的過程中,大臂、馬達、減速機的固定螺栓均需涂抹緊固膠,馬達與減速機結合面涂抹密封膠。
13. Reverse the above steps to complete the installation. During installation, the fixing bolts of boom, motor and reducer shall be coated with fastening glue, and the joint surface of motor and reducer shall be coated with sealant.
以上就是冷再生機租賃http://www.mshjwlk.com為大家介紹的內容,感謝您在百忙之中查看我公司的信息內容,如果您想要了解的更多,歡迎您來電進行咨詢!
The above is the lease of cold regenerator http://www.mshjwlk.com Thank you for checking the information of our company in your busy schedule. If you want to know more, you are welcome to call for consultation!
下一篇:冷再生機水穩層施工技術要注意什么? 上一篇:冷再生機道路維修起到是什么作用?
閱讀/ Recommended reading
- 冷再生機租賃故障應對:全流程解決指南 2025-07-04
- 水泥撒布車料倉:讓存量監測成為 “一目了然的智慧管家” 2025-07-03
- 冷再生機租賃:路面 “回春妙手” 能解哪些難題? 2025-07-02
- 冷再生機租賃:道路養護的 “省錢省力魔法棒” 2025-07-01
冷再生機租賃:低溫與特殊地質下的破局之道
[2025-07-07]
在道路施工領域,冷再生機租賃業務日益紅火,但其在低溫環境與凍土、巖層等特殊地質條件下作業時,常面臨諸多挑戰。深刻了解設備低溫啟動限制,掌握應對特殊地質的有效方法,是租賃方與施...